SLIDING GUIDE
NORM FIXING is pipe support systems, pipe hanging systems, solutions manufacturer. We manufacture and supply clamps for ventilation pipe clamps and its accessories, sprinkler pipe clamps and beam clamp for fire fighting system, pipe clamps for heat and cold water and drainage system lines, anchors, threaded rods, hanging accessories (U-, L-, C- type perforated channels) etc.
NORM FIXING produces sliding hinges and offering to its partners for many years. After R&D feasibilities and studies NORM FIXING is proud to offer the new range which is called sliding guides. Sliding guide range allows to mount the piping systems to work in narrow places comfortly.
THE BIG 5 DIGITAL FESTIVAL
23 November 2020NORM FIXING worths to meet with its partners in all over the World to discuss and improve its cooperation opportunities with them together. We are glad to announce that NORM FIXING participates The BIG 5 Digital Fair between 23-26.November.2020 as a pipe clamps manufacturer and supplier (for ventilation and fire fighting system, heat & cold water and drainage system lines), anchors, threaded rods, hanging accessories (U-, L-, C- type perforated channels) and other fixing elements such as U-bolts and beam clamps. We are looking forward to meet and discuss our cooperation together during the fair. Yours Sincerely,
NORM FIXING Has Passed its Acoustic Pipe Clamp Tests By Fraunhofer Test Laboratory Germany
16 October 2020NORM FIXING is proud to offer its new engineered range with acoustic pipe clamps. The aim of these acoustic pipe clamps is to increase the comfort level at the living space significantly than the regular pipe clamps. NORM FIXING acoustic pipe clamps are used in the vertical waste water evacuation in the piping lines. Acoustic pipe clamps is very value added product especially for the multi-storey buildings such as hospitals, clinics, schools, elderly care centres etc. NORM FIXING acoustic pipe clamps have been tested and reported by German Test Laboratory FRAUNHOFER IBP - Stuttgart, GERMANY and approved its acoustic pipe clamp’s quality and offer its partners to add value to the living spaces.
Normfixing deserved to obtain UL Certificate.
25 April 2015Normfixing, deserved to get UL certificate by fulfilling all required conditions.
Normfixing company extended the expiry date of the certificate of TSEK.
01 April 2015Normfixing company has passed successfully the annual inspection of Turkish Standards Institute (TSE) and renewed the expiry date of certificate.
Normfixing company deserved to receive FM Approval certificate
14 March 2015Normfixing, deserved to obtain FM Approval Certificate by fulfilling all conditions.
Normfixing started the production of perforated channels.
09 March 2015Normfixing, started the production of perforated channels which are fully fits the standards and quality.
Normfixing opened its new warehouse in Anatolian side of Istanbul.
01 January 2015Normfixing opened its new warehouse in Anatolian side of Istanbul at the address of Serifali Mh. Semah Sk. No:25/A-B Umraniye in order to be able to give better servise to its agents.
Normfixing company extended the expiry date of the certificate of GOST
16 May 2014The expiry date of GOST certificate is renewed in 2015.
Normfixing company deserved to obtain TUV certificate
31 July 2013Normfixing company, received certificate from TUV SUD company for tensile test of their products and calibration of its testers. And so, the values of tensile tests and the calibration of testers become approved by TUV.
Normfixing moved to its new factory building in Hadimkoy
05 September 2011Normfixing, started the production of their Goods in their new factory which has 3.310 m² open and 2.500 m² closed area.